Solar has never been more popular. So why do solar farms keep getting rejected?

Large solar farm in rural UK

Solar enjoys 86% public support in the UK, yet the proposed Lime Down farm in Wiltshire drew nearly 5,000 objections. The same 500MW could sit on around 100,000 rooftops instead, generating power where people use it: no lost farmland, less grid congestion, lower bills from day one. There is another way to build 500MW, and it starts on the roof.

The Complete Guide to Funded Solar and Storage for New-Build Homes (2026)

new build development

The Future Homes Standard makes solar unavoidable for new-build homes. This guide compares every route available to UK house builders for delivering solar and battery systems, from zero-CAPEX subscriptions and private-wire microgrids to energy supplier tariff partnerships, government schemes, and self-funding. Find the right model for your development.

Independent Developer Analysis of Gryd on a 55-Home Site

small to medium sized constriction site of new build houses in the suburbs

How one UK developer cut energy specification costs from £9,560 to £2,734 per plot on a 55-home site while keeping every home at EPC A. An independent analysis of Gryd’s funded solar and battery model versus self-supply, with full cost breakdowns and strategic findings.